On December 8, 2021 Heli factor signed agreement with Artmedik Sp. z o.o – Hospital in Jędrzejów, for execution in formula “design and build” permanent fire installation of the elevated heliport.
The subject of the contract includes:
• Preparation of Design Documentation and obtaining all legally required decisions on behalf of the Contracting Authority and arrangements necessary to perform construction works (including arrangements with a fire protection expert and obtaining a positive opinion of the Polish Medical Air Rescue and other competent authorities or entities);
• Installation of: foam cannon, hydrant installation, pumping set, drain pipes, evacuation lighting and manual call point by the landing field and mobile fire equipment.
The expected completion date is July 2022.
Contract value: 510.532,10 PLN gross